高墩大跨连续刚构桥抗震性能研究
DOI:
作者:
作者单位:

作者简介:

通讯作者:

基金项目:


Study on Seismic Performance of Tall-pier and Long-span Continuous Rigid-framed Bridge
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    用设有多个塑性铰的全桥计算模型研究了连续刚构桥的抗震性能,并与类似的连续梁桥作了比较。结果表明连续刚构桥在高烈度地震区所受的地震损伤仍很小,抗震性能明显高于类似的连续梁桥;刚构墩出现塑性后,与弹性的相比墩底的地震力明显减小,随着地震动强度的增加减小的幅度增大,但墩顶位移变化很小。

    Abstract:

    The seismic performance of tall-pier and long-span continuous rigid-framed bridge is studied by using the genreal analysis model with multi-plastic hinges,and compared with the similar continuous beam bridge.It is founded that the continuous rigid-framed bridge only suffers damage slightly in strong ground motions,and the earthquake resistant capability of this bridge is obviously more excellent than that of the continuous beam bridge.Compared with the elastic seismic response,seismic force at the base pier is significantly reduced when plastic hinges are formed in major pier.In addition,the seismic force is greatly reduced along with intensity of ground motion increasing,but increase of displacement at the pier top is not evident.

    参考文献
    相似文献
    引证文献
引用本文

夏修身,陈兴冲,王常峰,张永亮.高墩大跨连续刚构桥抗震性能研究[J].地震工程学报,2010,32(1):88-91. XIA?Xiu-shen, CHEN?Xing-chong, WANG?Chang-feng, ZHANG?Yong-liang. Study on Seismic Performance of Tall-pier and Long-span Continuous Rigid-framed Bridge[J]. China Earthquake Engineering Journal,2010,32(1):88-91.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-05-16