区域地震台网合理布局问题的探讨
DOI:
作者:
作者单位:

作者简介:

通讯作者:

基金项目:


A STUDY ON THE REASONABLE DISTRIBUTION OF THE REGIONAL SEISMOLOGICAL STATION NET
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    从地震仪配套的角度讨论了区域地震台网合理布局的问题,得出:
    (1) 在台网内相邻台站之间的台距为50公里左右的台站上配备V0=1.0×105,1.5×104,2.5×103,4.0×102四种短周期可见记录地震仪,同时给台距不大于200公里的台站配备V0=50的中强震仪,能够测定网内Ms=1级以上地震的震源位置。
    (2) 如果台距不超过150公里,按上述仪器配备,可测定网内Ms=1.5级以上地震的震源位置。
    根据上述结果,结合甘肃省现有地震台站的台址状况,提出了甘肃省地震台网合理布局的方案。按照这一方案布局,甘肃省东部地区基本上能定出台网内部发生的Ms=1.5级以上地震的震源位置,而河西地区就只能基本定出嘉峪关以东沿走廊的长条地带发生的Ms=2.0级以上地震的震源位置。

    Abstract:

    In this paper the reasonable distridution of the regional station net has been discussed in view of furnishing with seismographs, and the results have been obtained as follows:
    (1) If each station of the network, in which the distance between neigboring stations is about 50 kilometres, is furnished with four visible short period recording seismographs (V0=1.0×105, 1.5×104, 2.5×103, 4.0×102, and if at the same time, several stations, the distance bet ween which is less than 200 kilometres, are furnished with one moderately strong-motion seismograph of V0=50 each, the hypocentres of the earthquakes with magnitude over 1 (Ms ≥ 1) within the network may be determined.
    (2)If the distance between neigboring stations is less than 150 kilometres and all of them have been furnished with the above-mentioned instruments, the hypocentres of the earthquakes with Ms ≥ 1.5 maybe determined.
    On the basis of the above-mentioned results and the present station conditions in Gansu province, the project of the reasonable distribution of the station nets in Gansu has been is suggested. According to this project, in the station net of the east region of Gansu, the hypocentres of the earthquakes with Ms ≥ 1.5 can be probably determined, but in the Gansu Corridor (the western part of Gansu), the hypocentres of the earthquakes with Ms ≥ 2.0 which occur along the long corridor zone in the east region to Jaryuguan (嘉峪关) can be determined probably.

    参考文献
    相似文献
    引证文献
引用本文

刘多棫,石特临,马业新.区域地震台网合理布局问题的探讨[J].地震工程学报,1981,3(1):112-117. Liu Duoyu, Shi Teling, Ma Yexing. A STUDY ON THE REASONABLE DISTRIBUTION OF THE REGIONAL SEISMOLOGICAL STATION NET[J]. China Earthquake Engineering Journal,1981,3(1):112-117.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
历史
  • 收稿日期:1980-06-01
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2017-06-28