According to the concrete situations of Wushan seismostation, a data management system has been successfully accomplished by using Fo-chase + 2. 10 in CCDOS environment. The system is mainly used to manage data and automatically generate all kinds of tables. The procedure is designed adopting top-down and stepwise refinement way. All of the modules have pull-down menu and man-machine interfaces are very friendly. In the procedure, maximum failure tolerance is adopted and its performance is very good. The practical run over a year has shown that the system perfectly satisfies the needs of day-to-day work of the Wushan seismostation.
参考文献
相似文献
引证文献
引用本文
石骁,赵启垣,吕含让.武山台数据信息管理系统设计与实现[J].地震工程学报,1996,18(2):60-66. Shi Xiaofei, Zhao Qiyuan, Lu Hanrang. THE DESIGN AND ACCOMPLISHMENT OF SEISMIC DATA MANAGEMENT SYSTEM FOR WUSHAN STATION[J]. China Earthquake Engineering Journal,1996,18(2):60-66.