波形拟合法在人工挖孔扩底桩承载力测试中的应用
DOI:
作者:
作者单位:

作者简介:

通讯作者:

基金项目:


APPLICATION OF THE WAVEFORM FITTING METHOD IN DETERMINING BEARING CAPACITY OF ARTIFICIAL EXCAVATED BELLED PILE
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    从人工挖孔扩底桩的工作机理和波形拟合法的基本原理出发,结合工程实例阐述了波形拟合法在确定人工挖孔扩底桩承载力中的应用特点及可行性.

    Abstract:

    Based on the mechanism of artificial excavated belled pile foundation and the basic principle of waveform fitting method, features and practicability about the method applied to determing bearing capacity of the pile foundation are explicated in associated with several practical engineering examples.

    参考文献
    相似文献
    引证文献
引用本文

吕芝全,潘纪顺,刘长来,海蕊,王碧辉,孙方宇.波形拟合法在人工挖孔扩底桩承载力测试中的应用[J].地震工程学报,2002,24(1):78-84. Lu Zhi-quan, Pan Ji-shun, Liu Chang-lai, Hai Rui, Wang Bi-hui, Sun Fang-yu. APPLICATION OF THE WAVEFORM FITTING METHOD IN DETERMINING BEARING CAPACITY OF ARTIFICIAL EXCAVATED BELLED PILE[J]. China Earthquake Engineering Journal,2002,24(1):78-84.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
历史
  • 收稿日期:2000-11-06
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2017-06-24