地磁低点位移以磁暴倍九法作为补充预测的讨论
作者:
作者单位:

作者简介:

通讯作者:

基金项目:


Discussion on the Geomagnetic Low-point Displacement Methodwith the Magnetic Storm Nine Days Multiplication Mehtodas a Supplementary Prediction
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    短临地震预测方法中,中国地震科学家提出了地磁低点位移法与磁暴倍九法。这两种方法经过了几十年时间的验证,但其对地震进行准确的预测还是较为困难的,鉴于此,建议以低点位移作为第一预测方案的主方案,而以磁暴倍九法作为补充的第二预测方案,以这两方法相配合来预测强地震发生的时间。以此为思路,以期今后能有更多资料与数据来提高此方法在短临预测方面的准确性。

    Abstract:

    In the short-term earthquake prediction method, the geomagnetic low-point displacement method and the rhythm of multiplied nine days after a magnetic storm are proposed by Chinese earthquake scientists. The two methods have been verified for decades, but it is still difficult to use them to accurately predict the earthquake. In view of this, our suggestion is to use the low-point displacement method as the main prediction scheme, and the rhythm of multiplied nine days after a magnetic storm as the second and supplementary prediction scheme. We combine the two methods together to predict the occurrence time of a strong earthquake. It is hoped that more data can be collected to improve the accuracy of the method in the field of short-term earthquake prediction.

    参考文献
    相似文献
    引证文献
引用本文

郭增建,郭安宁,贾源源,段博儒.地磁低点位移以磁暴倍九法作为补充预测的讨论[J].地震工程学报,2018,40(5):1131-1132. GUO Zengjian, GUO Anning, JIA Yuanyuan, DUAN Boru. Discussion on the Geomagnetic Low-point Displacement Methodwith the Magnetic Storm Nine Days Multiplication Mehtodas a Supplementary Prediction[J]. China Earthquake Engineering Journal,2018,40(5):1131-1132.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
历史
  • 收稿日期:2018-08-20
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2018-11-23