The geological disasters often occur in the construction of tunnel, it is necessary to adopt geology prediction before the construction. In this paper, technique characteristic and principle of TSP system are introduced and some techniques in using TSP are discussed based on an application example. It is found that the geotechnical investigation can help us decide reasonable probing program and heighten the prediction precision.
冯永,李永鸿,杜文哲. TSP在隧道超前地质预报的应用研究[J].地震工程学报,2006,28(4):348-351. FENG?Yong, LI?Yong-hong, DU?Wen-zhe. Study on Application of TSP Geology Prediction in Tunnel Construction[J]. China Earthquake Engineering Journal,2006,28(4):348-351.